Dealership centre design project
A set of work was implemented to develop a design project for a MAN dealership.
The project in figures:
- number of months spent on the design project – more than 5;
- area of the centre – more than 4000 sq. m. + adjacent territory;
- number of renderings and drawings – more than 100;
- number of products required to decorate the centre – more than 150 units.